← Back to search

CDOT permit

2351 - 2408 N TRIPP AVE

DOT Public Way Opening · Permit #DOT2253053

Issued
Jun 24, 2026
Status
Open
Total fees
$281,617.50
Ward
31

What’s happening here?

Work in Advance

Issued to contractors to open the public way when they have also acquired a dig ticket.

Work description

Curblane closure when removing and replacing materials

Schedule

Start date
Jun 23, 2026
Expiration date
Dec 30, 2026
End date
Dec 31, 2026
Processed
Jun 17, 2026

Permit details

Application name
B-6-257 P2 Fullerton Kildare-A
Permit type
DOT Public Way Opening
Application type
DOT_PWO
Work type
Work in Advance
Milestone
Inspection
Waived fees
$281,617.50

Street closure & notes

Street closure
Curblane

Type of Work Performed: B-6-257 Scope of work includes Street Resurfacing, HMA Patching, milling, Remove and replace curb and gutter extensions, PCC sidewalk, PCC bike elements, PCC Medians, structure adjustments, pavement markings, MMA, signs installation, and landscaping.<div><br></div><div>Work can begin in the westbound direction of Fullerton Ave at 7:00am as long as it does not violate the noise ordinance<br><div><div><br></div><div><br></div></div></div>

Contacts

  • BIGANE PAVING CO (CONSTRUCTION)*

    Primary contact

    935 W CHESTNUT ST STE 100

    CHICAGO, IL, 60642-5448

  • efren magana

    Emergency contact

View source data

Original City of Chicago CDOT permit record.

{
  ":id": "row-ppth_c9aq_cacj",
  "ward": "31",
  "detail": "Curblane closure when removing and replacing materials",
  "suffix": "AVE",
  "comments": "Type of Work Performed: B-6-257 Scope of work includes Street Resurfacing, HMA Patching, milling, Remove and replace curb and gutter extensions, PCC sidewalk, PCC bike elements, PCC Medians, structure adjustments, pavement markings, MMA, signs installation, and landscaping.<div><br></div><div>Work can begin in the westbound direction of Fullerton Ave at 7:00am as long as it does not violate the noise ordinance<br><div><div><br></div><div><br></div></div></div>",
  "latitude": "41.9240951092",
  "location": {
    "latitude": "41.92409510917155",
    "longitude": "-87.73273598025392",
    "human_address": "{\"address\": \"\", \"city\": \"\", \"state\": \"\", \"zip\": \"\"}"
  },
  "worktype": "WorkInAdv",
  "direction": "N",
  "longitude": "-87.7327359803",
  "totalfees": "281617.5",
  "uniquekey": "2903449241982",
  "streetname": "TRIPP",
  "waivedfees": "281617.5",
  ":updated_at": "2026-11-18T08:28:08.550Z",
  "xcoordinate": "1147694",
  "ycoordinate": "1915503",
  "streetclosure": "Curblane",
  "streetnumberto": "2408",
  "applicationname": "B-6-257 P2 Fullerton Kildare-A",
  "applicationtype": "DOT_PWO",
  "currentmilestone": "Inspection",
  "streetnumberfrom": "2351",
  "applicationnumber": "DOT2253053",
  "applicationstatus": "Open",
  "primarycontactzip": "60642-5448",
  "applicationenddate": "2026-12-31T23:59:59.000",
  "primarycontactcity": "CHICAGO",
  "primarycontactlast": "BIGANE PAVING CO (CONSTRUCTION)*",
  "primarycontactstate": "IL",
  "worktypedescription": "Work in Advance",
  "applicationstartdate": "2026-06-24T00:00:00.000",
  "emergencycontactname": "efren magana",
  "primarycontactstreet": "935 W CHESTNUT ST STE 100",
  "applicationexpiredate": "2026-12-31T00:00:00.000",
  "applicationissueddate": "2026-06-24T15:14:17.000",
  "applicationdescription": "DOT Public Way Opening",
  "applicationprocesseddate": "2026-06-17T08:51:28.000"
}