← Back to search

CDOT permit

4551 - 4605 W MADISON ST

DOT Occupy the Pub. ROW Permit · Permit #DOT2252736

Issued
Not provided
Status
Open
Total fees
Not provided
Ward
28

What’s happening here?

Work Vehicles, Temporary Driveways, Barricades, Operating Equipment

Work description

PARTIAL STREET CLOSURE, FLAGGING TO ALLOW TRAFFIC TO FLOW BOTH DIRECTIONS. PARTIAL CLOSURE OF WB LANES SHIFTING TRAFFIC IN THE EB LANE AND SWITCHING ONCE BRIDGE INSPECTION IS COMPLETE OVER THE WB LANES TO THE EB LANES.

Schedule

Start date
May 2, 2027
Expiration date
Not provided
End date
May 31, 2027
Processed
Not provided

Permit details

Application name
BRC ANNUAL BRIDGE INSPECTION
Permit type
DOT Occupy the Pub. ROW Permit
Application type
DOT_OCC
Work type
Work Vehicles, Temporary Driveways, Barricades, Operating Equipment
Milestone
Incomplete Application
Waived fees
Not provided

Street closure & notes

Street closure
Partial

A series of permits to be applied for that allow bridge inspection of the Belt Railway Company of Chicago (BRC) to take place throughout the City of Chicago. The inspection typically requires partial lane closures using flaggers allowing traffic to continue to flow through the bride structure. Occupancy of any lane typically doesn't exceed 30 minutes before a shift of flagging operations into the adjacent lane.

Contacts

  • Quandel Consultants*

    Primary contact

    525 Dunham Rd Suite 3

    Saint Charles, IL, 60174

  • Dean Smith

    Emergency contact

View source data

Original City of Chicago CDOT permit record.

{
  ":id": "row-unnf.y2tu~qqab",
  "ward": "28",
  "detail": "PARTIAL STREET CLOSURE, FLAGGING TO ALLOW TRAFFIC TO FLOW BOTH DIRECTIONS. PARTIAL CLOSURE OF WB LANES SHIFTING TRAFFIC IN THE EB LANE AND SWITCHING ONCE BRIDGE INSPECTION IS COMPLETE OVER THE WB LANES TO THE EB LANES.",
  "suffix": "ST",
  "comments": "A series of permits to be applied for that allow bridge inspection of the Belt Railway Company of Chicago (BRC) to take place throughout the City of Chicago. The inspection typically requires partial lane closures using flaggers allowing traffic to continue to flow through the bride structure. Occupancy of any lane typically doesn't exceed 30 minutes before a shift of flagging operations into the adjacent lane.",
  "latitude": "41.8804504666",
  "location": {
    "latitude": "41.88045046660041",
    "longitude": "-87.73983303356934",
    "human_address": "{\"address\": \"\", \"city\": \"\", \"state\": \"\", \"zip\": \"\"}"
  },
  "worktype": "GenOccupy",
  "direction": "W",
  "longitude": "-87.7398330336",
  "uniquekey": "29030151641173",
  "streetname": "MADISON",
  ":updated_at": "2026-06-10T07:32:08.451Z",
  "xcoordinate": "1145873",
  "ycoordinate": "1899585",
  "streetclosure": "Partial",
  "streetnumberto": "4605",
  "applicationname": "BRC ANNUAL BRIDGE INSPECTION",
  "applicationtype": "DOT_OCC",
  "currentmilestone": "Incomplete Application",
  "streetnumberfrom": "4551",
  "applicationnumber": "DOT2252736",
  "applicationstatus": "Open",
  "primarycontactzip": "60174",
  "applicationenddate": "2027-05-31T23:59:59.000",
  "primarycontactcity": "Saint Charles",
  "primarycontactlast": "Quandel Consultants*",
  "primarycontactstate": "IL",
  "worktypedescription": "Work Vehicles, Temporary Driveways, Barricades, Operating Equipment",
  "applicationstartdate": "2027-05-03T00:00:00.000",
  "emergencycontactname": "Dean Smith",
  "primarycontactstreet": "525 Dunham Rd Suite 3",
  "applicationdescription": "DOT Occupy the Pub. ROW Permit"
}