CDOT permit
7458 - 7515 S UNION AVE
DOT Occupy the Pub. ROW Permit · Permit #DOT2255008
- Issued
- Not provided
- Status
- Open
- Total fees
- Not provided
- Ward
- 17
What’s happening here?
Work Vehicles, Temporary Driveways, Barricades, Operating Equipment
Work description
PARTIAL STREET CLOSURE, FLAGGING TO ALLOW TRAFFIC TO FLOW BOTH DIRECTIONS. PARTIAL CLOSURE OF WB LANES SHIFTING TRAFFIC IN THE EB LANE AND SWITCHING ONCE BRIDGE INSPECTION IS COMPLETE OVER THE WB LANES TO THE EB LANES.
Schedule
- Start date
- May 9, 2027
- Expiration date
- Not provided
- End date
- Jun 7, 2027
- Processed
- Not provided
Permit details
- Application name
- BRC ANNUAL BRIDGE INSPECTION
- Permit type
- DOT Occupy the Pub. ROW Permit
- Application type
- DOT_OCC
- Work type
- Work Vehicles, Temporary Driveways, Barricades, Operating Equipment
- Milestone
- Incomplete Application
- Waived fees
- Not provided
Street closure & notes
- Street closure
- Partial
A series of permits to be applied for that allow bridge inspection of the Belt Railway Company of Chicago (BRC) to take place throughout the City of Chicago. The inspection typically requires partial lane closures using flaggers allowing traffic to continue to flow through the bride structure. Occupancy of any lane typically doesn't exceed 30 minutes before a shift of flagging operations into the adjacent lane.
Contacts
-
Quandel Consultants*
Primary contact
525 Dunham Rd Suite 3
Saint Charles, IL, 60174
Dean Smith
Emergency contact
View source data
Original City of Chicago CDOT permit record.
{
":id": "row-djsw_24ck-byvh",
"ward": "17",
"detail": "PARTIAL STREET CLOSURE, FLAGGING TO ALLOW TRAFFIC TO FLOW BOTH DIRECTIONS. PARTIAL CLOSURE OF WB LANES SHIFTING TRAFFIC IN THE EB LANE AND SWITCHING ONCE BRIDGE INSPECTION IS COMPLETE OVER THE WB LANES TO THE EB LANES.",
"suffix": "AVE",
"comments": "A series of permits to be applied for that allow bridge inspection of the Belt Railway Company of Chicago (BRC) to take place throughout the City of Chicago. The inspection typically requires partial lane closures using flaggers allowing traffic to continue to flow through the bride structure. Occupancy of any lane typically doesn't exceed 30 minutes before a shift of flagging operations into the adjacent lane.",
"latitude": "41.758189994",
"location": {
"latitude": "41.758189994019936",
"longitude": "-87.64194184193519",
"human_address": "{\"address\": \"\", \"city\": \"\", \"state\": \"\", \"zip\": \"\"}"
},
"worktype": "GenOccupy",
"direction": "S",
"longitude": "-87.6419418419",
"uniquekey": "29062511644421",
"streetname": "UNION",
":updated_at": "2026-06-17T07:30:09.737Z",
"xcoordinate": "1172889",
"ycoordinate": "1855233",
"streetclosure": "Partial",
"streetnumberto": "7515",
"applicationname": "BRC ANNUAL BRIDGE INSPECTION",
"applicationtype": "DOT_OCC",
"currentmilestone": "Incomplete Application",
"streetnumberfrom": "7458",
"applicationnumber": "DOT2255008",
"applicationstatus": "Open",
"primarycontactzip": "60174",
"applicationenddate": "2027-06-07T23:59:59.000",
"primarycontactcity": "Saint Charles",
"primarycontactlast": "Quandel Consultants*",
"primarycontactstate": "IL",
"worktypedescription": "Work Vehicles, Temporary Driveways, Barricades, Operating Equipment",
"applicationstartdate": "2027-05-10T00:00:00.000",
"emergencycontactname": "Dean Smith",
"primarycontactstreet": "525 Dunham Rd Suite 3",
"applicationdescription": "DOT Occupy the Pub. ROW Permit"
}