← Back to search

CDOT permit

4045 - 4116 N OAKLEY AVE

DOT Public Way Opening · Permit #DOT2282882

Issued
Sep 4, 2026
Status
Open
Total fees
$33,526.87
Ward
47

What’s happening here?

Opening in the Public Way

Issued to contractors to open the public way when they have also acquired a dig ticket.

Work description

Not provided

Schedule

Start date
Aug 31, 2026
Expiration date
Dec 17, 2026
End date
Dec 18, 2026
Processed
Aug 27, 2026

Permit details

Application name
24-0721-L3-ST-425
Permit type
DOT Public Way Opening
Application type
DOT_PWO
Work type
Opening in the Public Way
Milestone
Inspection
Waived fees
$8,526.87

Street closure & notes

Street closure
Curblane

Proposed Lumen/Level 3 fiber conduit installation, two (2) manholes via open cut trench and directional bore<div><br></div><div><span style="font-size: 11pt">extended to continue the underground construction scope.</span></div><div><span style="font-size: 14.6667px">SEPT 30 2026 - OCT 30 2026</span></div><div><span style="font-size: 14.6667px"><br></span></div><div><span style="font-size: 14.6667px">OCT 30 2026 - NOV 30 2026</span></div><div><span style="font-size: 11pt; font-family: Arial, sans-serif">extended to complete the concrete &amp; HMA restoration.</span><span style="font-size: 14.6667px"></span></div><div><span style="font-size: 14.6667px"><br></span><div><br></div><div><br></div></div>

Contacts

  • LEVEL 3 COMMUNICATIONS DBA LUMEN*

    Primary contact

    1025 Eldorado Blvd

    Broomfield, CO, 80021

  • matt welton

    Emergency contact

View source data

Original City of Chicago CDOT permit record.

{
  ":id": "row-vyzn_akbd_5zj7",
  "ward": "47",
  "suffix": "AVE",
  "comments": "Proposed Lumen/Level 3 fiber conduit installation, two (2) manholes via open cut trench and directional bore<div><br></div><div><span style=\"font-size: 11pt\">extended to continue the underground construction scope.</span></div><div><span style=\"font-size: 14.6667px\">SEPT 30 2026 - OCT 30 2026</span></div><div><span style=\"font-size: 14.6667px\"><br></span></div><div><span style=\"font-size: 14.6667px\">OCT 30 2026 - NOV 30 2026</span></div><div><span style=\"font-size: 11pt; font-family: Arial, sans-serif\">extended to complete the concrete &amp; HMA restoration.</span><span style=\"font-size: 14.6667px\"></span></div><div><span style=\"font-size: 14.6667px\"><br></span><div><br></div><div><br></div></div>",
  "latitude": "41.9553920929",
  "location": {
    "latitude": "41.95539209285787",
    "longitude": "-87.68593350213371",
    "human_address": "{\"address\": \"\", \"city\": \"\", \"state\": \"\", \"zip\": \"\"}"
  },
  "worktype": "GenOpening",
  "direction": "N",
  "longitude": "-87.6859335021",
  "totalfees": "33526.87",
  "uniquekey": "29701633193199",
  "streetname": "OAKLEY",
  "waivedfees": "8526.87",
  ":updated_at": "2026-11-19T08:08:27.408Z",
  "xcoordinate": "1160345",
  "ycoordinate": "1927000",
  "streetclosure": "Curblane",
  "streetnumberto": "4116",
  "applicationname": "24-0721-L3-ST-425",
  "applicationtype": "DOT_PWO",
  "currentmilestone": "Inspection",
  "streetnumberfrom": "4045",
  "applicationnumber": "DOT2282882",
  "applicationstatus": "Open",
  "primarycontactzip": "80021",
  "applicationenddate": "2026-12-18T23:59:59.000",
  "primarycontactcity": "Broomfield",
  "primarycontactlast": "LEVEL 3 COMMUNICATIONS DBA LUMEN*",
  "primarycontactstate": "CO",
  "worktypedescription": "Opening in the Public Way",
  "applicationstartdate": "2026-09-01T00:00:00.000",
  "emergencycontactname": "matt welton",
  "primarycontactstreet": "1025 Eldorado Blvd",
  "applicationexpiredate": "2026-12-18T00:00:00.000",
  "applicationissueddate": "2026-09-04T11:01:48.000",
  "applicationdescription": "DOT Public Way Opening",
  "applicationprocesseddate": "2026-08-27T15:49:00.000",
  "parkingmeterpostingorbagging": "Y"
}